





| |

SIGNIFICANT DATES IN CANADIAN RAILWAY HISTORY

The entries in this listing are shown in chronological order.
 | 1720 - A short tramway is believed to have been built in connection with the
construction of the fortress at Louisburg, Nova Scotia.
|
 | 1762 - The Niagara Incline Plane is constructed. This was a rudimentary
tramway or inclined plane over which freight was hauled in wooden sleds (i.e.
the vehicles had no wheels).
|

 | 1818 - A tramway was reputed to have been constructed to haul coal at
Pictou, Nova Scotia using horses as motive power. The existence of this
line has been seriously questioned ( Nova
Scotia's First Tramway: Landmark or Legend? ) A regular rail track was
laid in 1829 using rails made at the Albion Mines. These rails were the first
metal rails used in Canada and possibly in North America. The tramway was
operated by horsepower until 1838.
|
 | 1823 - The Quebec Citadel Incline Plane is opened using two cars on
double track. Power was supplied by a stationary steam engine. This was used
until the late 1840's.
|
 | 1826-7 - A tramway using wooden rails is built in Kingsey Township,
Quebec. The exact location is not known but it was believed to have been
built from a point on the east bank of the St. Francis River, about nine or ten
miles below Richmond and extended into the forest, about four miles, to a point
at or near the present village of St. Felix de Kingsey.
|
 | 1827 - A tramway, just under a mile long, is built at Bytown, now Ottawa,
from a stone quarry near Hog's Back to transport stone for the locks and weirs
on the Rideau Canal and was abandoned with the opening of the Rideau Canal in
1832.
|

 | 1830 - The Sydney Mines Railway is opened at Sydney, Nova Scotia. This
was a horse drawn tramway.
|
 | 1830 - The two mile Bridgeport Tramway, Nova Scotia, is opened by the
General Mining Association. It was abandoned in 1849.
|
 | 1832, February 25 - Incorporation of the Champlain and St. Lawrence
Railroad to build from Dorchester, now St-Jean, to a point on the St.
Lawrence River at or near Laprairie. This is the first Canadian railroad
charter.
|
 | 1836, March - Incorporation by the Legislature of New Brunswick of the St.
Andrews and Quebec Rail Road Company to build from St. Andrews to lower
Canada. This is the oldest charter of a Canadian Pacific constituent. Operation
was not commenced until spring, 1851.
|
 | 1836, July 21 - Champlain and St. Lawrence Railroad opened. This was
Canada's first public railroad. The inaugural train was pulled by the locomotive
the "Dorchester". In 1857 the Champlain and St. Lawrence became part of the
Montreal and Champlain Railroad which was leased to the Grand Trunk in 1864 and
now forms part of the Canadian National system.
|
 | 1839, September 19 - Official opening of the Albion Mines Railway between
Albion Coal Mines and New Glasgow, N.S. using theTimothy Hackworth steam
locomotives "Samson", "Hercules" and "John Buddle" imported from England.
|

 | 1847, July - Incorporation, by the Legislature of the Province of Canada, of
La Compagnie du Chemin à Rails du Saint-Laurent et du Village
d'Industrie, to build from Lanoraie, on the Saint Lawrence downstream from
Montreal, to Village d'Industrie, 12 miles. Village d'Industrie was later
renamed Joliette after its founder, Barthelemy Joliette. This railway originally
had wooden rails surmounted by iron straps. It was taken over by the Quebec,
Montreal, Ottawa and Occidental Railway in 1878 and acquired by CP in 1884.
|

 | 1851, July 31 - The 5'6" gauge, broad gauge, is adopted as the standard
gauge for Ontario and Quebec. The broad gauge was used until about 1870 after
which time there was a gradual change to the now standard 4' 8 1/2" gauge.
|
 | 1853, May 16 - The first train in Ontario runs between Toronto and Aurora on the
Ontario Simcoe and Huron Railroad Union Company. The name was changed to
Northern Railway of Canada on August 16, 1858 and it became part of the Northern
and Northwestern Railway on June 6, 1879, now part of Canadian National.
|
 | 1853, July 15 - Grand Trunk Railway is formed by the amalgamation of the
following companies:
|
 |
Grand Trunk Railway of Canada Grand Junction Railway Grand Trunk Railway Company of Canada East Quebec and Richmond Railway St. Lawrence and Atlantic Railway Toronto and Guelph Railway
|
The Grand Trunk also leased the Atlantic and St.
Lawrence Railway giving access to Portland, Maine.
 | 1854 - The Great Western Railway opens its main line between Windsor and
Niagara Falls. The Great Western went on to build, lease or buy other railways
throughout Southern Ontario, and it can be claimed to be the first Canadian
system.
|
 | 1854, December 25 - Opening of the Bytown and Prescott Railway between
Prescott and Bytown (now Ottawa), 54 miles. First rail service to what is now
Canada's Capital. Bytown was renamed Ottawa in 1855 and the railway became the
Ottawa and Prescott Railway Company, now part of Canadian Pacific.
|
 | 1855, March 19 - The vehicular suspension bridge across the Niagara Gorge
(built in 1848) is strengthened for the passage of railway trains. The original
wooden trusses were replaced by steel in 1880.
|
 | 1855, December 3 - The Great Western Railway "branch" between Hamilton and
Toronto is opened to traffic.
|
 | 1856, October 27 - The Grand Trunk Railway opens its broad gauge line throughout
between Montreal and Toronto. It was opened in sections as follows:
|
Montreal to Brockville - November 19, 1855. Oshawa to Toronto - August 11, 1856. Brockville to Oshawa - October 27, 1856. The first through train,
consisting of 3 first class and 3 second class coaches, ran from Montreal (Point
St. Charles) to Toronto (Don Station) and a similar train made the journey in
the opposite direction.Departure was at 07:00 from Montreal and 07:30 from
Toronto. The trains passed in the vicinity of Kingston Junction where a
stop of 30 minutes occurred for lunch.
 | 1856, June 3 - Opening of Windsor Branch Railway from Windsor to Windsor
Jc., N.S. by Nova Scotia government. This was the oldest constituent of the
Dominion Atlantic Railway.
|
 | 1857, March 12 - A Great Western Railway train breaks an axle while crossing a
swing bridge and plunges into the Desjardins Canal near Hamilton. 59
people are killed.
|
 | 1859, December 12 - First train operated over the Victoria Railway
Bridge, Montreal. The first passenger train crossed the structure on
December 17, 1859 and it was formally opened by the Prince of Wales, later to
become King Edward VII, on August 25, 1860. The original structure was a
single-track iron tubular bridge. The tube, when first constructed, was entirely
enclosed and there were ventilation problems. Later a slit 20" wide was cut in
the tube the full length of the bridge to permit the emission of smoke.
|
 | 1859, December 27 - The Grand Trunk Railway completes its line between
Toronto and Sarnia and establishes a ferry service across the St. Clair
River to Fort Gratiot (Port Huron).
|

 | 1860 - Grand Trunk opens its line between Quebec and Rivière du Loup.
|
 | 1860, August 1 - European and North American Railway opens from Saint
John, NB to Shediac. The line became part of the Intercolonial Railway on July
1, 1867.
|
 | l860, December 31 - The Brockville and Ottawa Railway opens a tunnel l/3
of a mile under the town of Brockville. This was the first railway tunnel in
Canada.
|
 | l864, June 29 - A railway accident on the Grand Trunk Railway at Beloeil,
Quebec, takes ninety-nine lives. This was Canada's worst railway disaster.
|
 | l867, July 1st - Dominion of Canada is formed by Confederation of
Ontario, Quebec, New Brunswick and Nova Scotia. One of the conditions of
Confederation was the building of a railway by the newly constituted Dominion
Government to connect Halifax with the St. Lawrence at or near Quebec. Sir
Sandford Fleming directed the surveying and construction of the trackage to
fill in the gap in the railway system between Rivière du Loup and Truro, the
Grand Trunk having previously constructed eastwards as far as Rivière du Loup
and the Province of Nova Scotia having built a line between Halifax and Truro.
|
The Canadian Government Railway, also known as the Intercolonial
Railway, was formed to take over the lines in Nova Scotia and to construct
the trackage between Rivière du Loup and Truro.

 | 1871, July 12 - North America's first public narrow gauge railway, the
Toronto and Nipissing, is opened for traffic between Toronto and
Uxbridge. The 3'6" gauge line was converted to standard by 1884.
|
 | 1871, July 20 - British Columbia is admitted to the Dominion of Canada.
One of the conditions of entry is that the Dominion Government should, within
two years from the date of union, commence the construction of a railway from
the Pacific towards the Rocky Mountains and from a point east of the Rocky
Mountains towards the Pacific to connect the seaboard of British Columbia with
the railway system of Canada.
|
Sir Sandford Fleming was appointed Engineer-in-Chief of this
railway which was to be completed by 1881.
 | 1872, November - The Grand trunk line between Sarnia and Buffalo via Stratford
and London as well as the St. Marys branch is changed from 5' 6" to standard
gauge. The actual work was done in 18 hours.
|
 | 1873, July 1 - Prince Edward Island joins Confederation. One of the
conditions was that the Dominion Government take over and complete the Prince
Edward Island Railway which had been commenced in 1871. The Intercolonial
Railway became responsible for the Prince Edward Island Railway and opened the
line between Charlottetown and Tignish for traffic on January 4, 1875.
|
 | 1873, October 3-4 - The Grand Trunk Railway converts the gauge of its
line between Stratford and Montreal, 421 miles together with 60 miles of
sidings, from 5' 6" to the standard gauge of 4' 8 1/2". The track work was
completed in 24 hours and occasioned but 16 hours interruption in the use of the
main line.
|
 | 1874, October 26 - All Grand Trunk Railway lines east of Montreal, 542 miles,
are converted from 5' 6" to standard gauge.
|
 | 1875, April 26 - First scheduled train over the Prince Edward Island
Railway from Charlottetown to Georgetown.
|
 | 1875, June 1 - Ceremony of turning the first sod on the Canadian Pacific
Railway on the left bank of the Kamistiquia River in the townsite of Fort
William about four miles from the river's mouth.
|
 | 1875 - The Intercolonial Railway converts its gauge from 5'6" to 4' 8
1/2".
|
 | 1876, July 1.- Through rail travel between Halifax, Quebec and the rest of the
Canadian rail system is made possible.
|
 | 1877, August - First use of the telephone to dispatch trains. This was at
the Caledonia Mine at Glace Bay on the Sydney Mines Railway. One of the owners
was Gardiner G. Hubbard who was the father in law of Alexander Graham Bell who
installed two telephones to control train movements.
|
 | 1877, October 9 - Locomotive Countess of Dufferin arrives at St. Boniface
on a barge towed by the steamer "Selkirk". It was brought in by the contractor
Joseph Whitehead to work on the Selkirk - Emerson line and was the first
locomotive in Manitoba and on the Prairies.
|
 | 1879, May 20 - The Department of Railways and Canals comes into effect
with a Minister having jurisdiction over all railways pertaining to the Dominion
Government. Previously this function had been covered by the Department of
Public Works.
|
 | 1879, August 12 - The Intercolonial Railway gains access to Quebec by
purchasing the Grand Trunk line between Quebec and Rivière du Loup.
|
 | l879, December 29 - The locomotive J.G. Haggart is taken over the ice of
the Red River into Winnipeg by the contractor Joseph Whitehead to start
construction westwards across the Prairies in the spring of 1880.
|

 | 1880,
January 31 - An Ice Railway is opened between Longueuil and Montreal by
the Quebec, Montreal, Ottawa and Occidental Railway. A railway track was placed
on large timbers laid on the ice of the St. Lawrence River. During the summer
months the QMO&O used a car ferry. An ice railway was laid each winter until
1883.
|
 | 1880 - The Grand Trunk Railway extends its line to Chicago, thus
providing a through route from the American Midwest to the St. Lawrence at
Montreal and Quebec and the Atlantic at Portland.
|
 | 1881, February 15 - Canadian Pacific Railway Act receives the Royal
Assent. A Royal Charter pursuant to the Act was granted on February 16th -
this incorporated the company. The principal terms provided for the payment to
the railway of a subsidy of $25,000,000 and 25,000,000 acres of land, plus the
railways (Port Arthur-Selkirk-Winnipeg-Emerson and Port Moody-Savona) already
contracted for by the government, upon their completion.
|
 | 188l, August 26 - First train into Winnipeg over the Red River Bridge.
|
 | 1882, January 1 - William Cornelius Van Horne is appointed General
Manager of the Canadian Pacific Railway. Van Horne succeeded in laying 480 miles
of track across the Prairies in the summer of 1882.
|
 | 1882, August 12 - Great Western Railway, controlling 1,009 miles of track
is merged into the Grand Trunk System.
|
 | l882, September 13 - The Canada Atlantic Railway is opened between Ottawa
and Coteau. This line which was built by John R. Booth was extended, within a
period of 20 years, into a system stretching from Georgian Bay to the Vermont
border.
|
 | 1883, August 10 - First train reaches Calgary.
|
 | 1883, September 22 - The Grand Trunk Railway acquires the 452 mile Midland
Railway.
|
 | 1884, November 1 - The Harbour Grace Railway, the first railway on
Newfoundland, is opened for traffic between St. Johns and Harbour Grace. The
last spike was driven by Prince George, later to become King George V, who was
at the time visiting Newfoundland as a midshipman aboard H.M.S. Cumberland.
|
 | l885, April - Second Northwest (Riel) Rebellion. Van Horne moves troops
to the west through northern Ontario entirely over Canadian soil. This efficient
military movement demonstrated the advantages to Canada of a completed
transcontinental railway and prompted the government to grant temporary aid to
the CP to enable completion of the line.
|
 | 1885, September 15 - the famous circus elephant "Jumbo" is killed by a
GTR freight train, hauled by locomotive no. 788 at St. Thomas. It was
struck from behind while being lead along the track to be loaded into his car.
Jumbo stood 12' 5" high and weighted 7 1/2 tons.
|
 | 1885, November 1 - First train service established over CP between Montreal
and Winnipeg via Ottawa, Sudbury and the Lakehead.
|
 | 1885, November 7 - The last spike is driven in the first Canadian
transcontinental main line at Craigellachie B.C. in the Eagle Pass. Van
Horne makes his famous fifteen-word speech "All I can say is that the work
has been well done in every way".
|
 | 1885, November 8 - The CP special train arrives in Port Moody at Pacific
Tidewater, the first railway train ever to travel across Canada from sea to
sea.
|
 | 1886, June - Contracts are let for the construction of the Chignecto Marine
Transport Railway, a 17 mile railway to carry ships across the Chignecto
Isthmus between Tidnish on Northumberland Strait and Fort Lawrence on the Bay of
Fundy in Nova Scotia. Work on this double track, standard gauge railway,
conceived by New Brunswick engineer Henry George Cloppers Ketchum,
commenced in 1887 but was abandoned, three quarters completed, when the funds
ran out in the summer of 1891.
|
 | 1887, May - The CP main line is extended 12.2 miles along Burrard Inlet to
Vancouver.
|
 | 1887 - The Grand Trunk Railway commences double tracking its main line
between Montreal and Toronto. The work was completed in 1903.
|
 | 1888, February 24 - The 494 mile long Northern and Northwestern Railway
is acquired by the GTR.
|
 | 1889, June 3 - The first CP train arrives in Saint John, NB from Montréal
marking the completion of the Canadian Pacific Railway as a coast to coast
railway.
|

 | l891, September 19 - The single track St. Clair tunnel under the St.
Clair River is opened by the Grand Trunk Railway. Construction had commenced in
1888 upon this tunnel which connects Sarnia with Port Huron.
|
 | 1896, March 20 - The Grand Trunk Railway obtains control of the Central
Vermont Railway which retained its corporate identity.
|
 | 1897, September 24 - A new double track steel arch bridge is completed by the
Niagara Falls Suspension Bridge Company and the Niagara Falls International
Bridge Company. The upper floor of the new structure is leased to the Grand
Trunk Railway.
|
 | 1898, March 1 - Through service commences over the Intercolonial Railway
between Halifax and Montreal. This is achieved through a series of leases
and running rights agreements with the Grand trunk Railway.
|
 | 1898, June 29 - First through passenger train across Newfoundland leaves
St. Johns at 19:20 and arrives Port aux Basques at 22:45, June 30.
|
 | 1898, December 13 - First passenger train over the newly reconstructed
Victoria Railway Bridge, Montreal. The original 1859 tube had been
replaced by a double track steel bridge.
|
 | 1899, January 13 - The Canadian Northern Railway is formed by the
amalgamation of the Winnipeg Great Northern Railway and the Lake Manitoba
Railway and Canal Company. William Mackenzie and Donald Mann then proceeded to
expand the Canadian Northern system so that by 1915 the system comprised 9,362
miles of trackage.
|
 | 1899, June 18 - The CP line from Lethbridge through Crows Nest Pass to Kootenay
Landing is opened for traffic. This was built with subsidies afforded by the
Crows Nest Pass Agreement of 1897 which also set fixed rates on grain
traffic.
|

 | 1900, August 15 - Regular service is commenced over the 3'0" gauge White Pass
and Yukon Railway between Skagway, Alaska and Whitehorse, Yukon.
|
 | 1903, October 24 - The National Transcontinental Railway Act is passed.
In order to expand into Western Canada the Grand Trunk Railway agrees to build a
line from Moncton, New Brunswick to Quebec, then on a more northerly route than
on any other transcontinental line to a point on the British Columbia Coast,
which was to become Prince Rupert. The part between Moncton and Winnipeg was to
be known as the National Transcontinental Railway and was to be built by the
government. The line west of Winnipeg, to be known as the Grand Trunk Pacific
Railway, was to be built by the Grand Trunk itself.
|
 | 1904, July 3 - First run of the Ocean Limited passenger train
between Montreal, Que. and Halifax. N.S. This is the longest running train in
Canada having operated continuously over the same 840 mile route.
|
 | 1905, October 1 - The Grand Trunk assumes control of the 460 mile Canada
Atlantic system by agreement dated August 15, 1904.
|
 | 1906, July 22 - The Grand Trunk Railway changes from left to right hand
running on double track sections. The change involved considerable
alteration in crossovers, switches and semaphore signals.
|
 | 1909, August - Canadian Pacific completes the Kicking Horse grade
relocation on the main line between Hector and Field, B.C. by substituting
two spiral tunnels and lengthened line on a grade of 2.2% compensated, for the
old "Big Hill" straight grade of 4.5%.
|
 | 1909 - Canadian Pacific completes the viaduct on the Crows Nest Pass Line at
Lethbridge, 5,327 feet long and with a maximum height of 314 feet above Oldman
River. This is the highest railway bridge in Canada.
|

 | 1910 - The last remaining broad gauge (5'6") line in North America, the
Carillon and Grenville Railway, is abandoned. It was a portage railway opened on
October 25, 1854. The railway lay idle from late 1910 until July 25, 1911 when
it was bought by the Canadian Northern Railway as part of its new Montreal to
Ottawa line.
|
 | 1912 - Canadian Pacific leases the following companies:
|
 | Dominion
Atlantic Railway Company, Nova Scotia, on January 3. Quebec
Central Railway Company, Quebec, on December 14. Esquimalt
and Nanaimo Railway Company, Vancouver Island, on July 1.
|
 | 1914, January 1 - The first part of the Pacific Great Eastern Railway is
opened for service between North Vancouver and Horseshoe Bay, 12 miles.
|
 | 1914, April 9 - Grand Trunk Pacific Railway main line is completed
between Winnipeg, Melville, Edmonton, Jasper and Prince Rupert.
|
 | 1914, October 13 - The Algoma Central and Hudson Bay Railway is opened
throughout between Sault Ste. Marie and Hearst, Ont. Construction was started in
1899 and it was opened in stages as follows:
|
 | Hawk Junction (junction with the Michipicoten Branch) - 1911. Franz, (crossing with CP) - mid 1912. Oba (crossing with CN) - late 1912.
|
The name was shortened to
Algoma Central in 1965.
 | 1914, December - The Greater Winnipeg Water District Railway is opened to
service the aqueduct between Winnipeg, Man and Shoal Lake, Ont.
|
 | 1915, June 1 - The National Transcontinental Railway is completed between
Moncton and Winnipeg via Edmundston, Quebec and Senneterre. Because of the high
cost the Grand Trunk refused to lease the line which was operated as a component
of the Canadian Government Railways until the formation of the Canadian National
System.
|
 | 1915 - The Canadian Northern Railway completes its transcontinental main
line from Vancouver to Quebec via Edmonton, North Battleford, Dauphin,
Winnipeg, Fort Frances, Capreol, Ottawa, Hawkesbury and Montreal.
|
 | 1915 - Canadian Government Railways are formed to operate the
Intercolonial and the National Transcontinental Railways.
|
 | 1916, December 9 - Canadian Pacific inaugurates the 5-mile Connaught
Tunnel which eliminated the old route over Rogers Pass and shortened the
line through the Selkirk Mountains by 4 1/2 miles.
|
 | 1917, May 2 - The Drayton-Acworth report is produced being the findings
of two out of three members of a Royal Commission which was set up in 1916. Sir
Henry L. Drayton was Chairman of the Board of Railway Commissioners for Canada
while William Ackworth came from London. The third member, who produced a
minority report, was Alfred H. Smith, President of the New York Central Railway.
The report recommends that the Government take over the Grand Trunk, the Grand
Trunk Pacific and the Canadian Northern companies and operate them as one system
together with the Intercolonial and the National Transcontinental Railway. The
recommendations are accepted by the Government.
|
 | 1917, October 17 - First train over the Quebec Bridge over the St.
Lawrence. This was constructed by the Dominion Government for use by the
National Transcontinental Railway. This bridge was notorious in that it fell
down twice during construction:
|
On August 29, 1907 the south cantilever arm collapsed killing 65 or more
workmen. On September 10, 1916 the suspension span, which was being lifted, buckled and
fell into the river killing 10 - 12 workmen.
 | 1917, October 23 - The Canadian Railway War Board holds its first meeting
in the Canadian Pacific Boardroom in Windsor Station, Montreal. The name was
changed to the Railway Association of
Canada in 1919. The RAC represents the interests of all railways operating
in Canada.
|
 | 1918, October 21 - The Mount Royal Tunnel, Montreal, is opened for
regular traffic by the Canadian Northern Railway.
|
 | 1918, November 20 - By order in Council P.C. 2854 the management of the
Canadian Government Railways is entrusted to the Board of Directors of the
Canadian Northern Railway Co. On the same day the Government takes over the
Canadian Northern Railway and appoints a new Board of Directors.
|
 | 1918, December 20 - The use of the collective title "Canadian National
Railways" is authorized by order in council P.C. 3122.
|
 | 1919, March 7 - The Minister of Railways is appointed as receiver for the
Grand Trunk Pacific Railway.
|
 | 1919, June 6 - Canadian National Railway Company is incorporated.
|

 | 1920, March 8 - The management of the Grand Trunk Pacific is entrusted to
the Board of Directors appointed for the Canadian National Railways.
|
 | 1922, October 4 - The Canadian National Railway Company becomes a
corporate entity (order in council P.C. 2094).
|
 | 1923, January 19 - The Grand Trunk Railway is amalgamated into the
Canadian National System by order in council P.C. 114. By 1923 the system
included the Canadian Government Railways (including the Intercolonial, the
Prince Edward Island and the National Transcontinental Railways); the Hudson Bay
Railway; the Canadian Northern and its subsidiaries; the Grand Trunk Pacific;
and the Grand Trunk (including the Grand Trunk Western and the Grand Trunk New
England lines).
|
 | 1924, September 15 - Canadian National opens the 30.66 mile Long Lake Cut
off from Long Lake to Nakina, Ontario.
|
 | 1925, November 4 - Canadian National diesel electric car No. 15280 completes a
run from Montreal to Vancouver in a total elapsed time of 72 hours and an actual
running time of 67 hours 7 minutes.
|
 | 1927, August 6 - The third Toronto Union Station is opened officially by
Edward, Prince of Wales. It was opened to the public on August 11, but
passengers had to walk across to the old station tracks. The first day on which
trains used the new, elevated, tracks through the new station platform was
January 31, 1930.
|
 | 1927, October - A report prepared by Frederick Palmer of London recommends that
Churchill should be selected as the terminal port for the Hudson Bay
Railway. As a result, the work previously carried out at Port Nelson is
abandoned in favour of Churchill.
|
 | 1929, June 26 - The following railways are jointly acquired by Canadian National
and Canadian Pacific and operated under a newly incorporated company, the
Northern Alberta Railways:
|
 | Edmonton, Dunvegan & British Columbia Railway (447 miles) Alberta & Great Waterways Railway (286 miles) Central Canada Railway (98 miles) Pembina Valley Railway (26 miles)
|
A total of 857 miles.
 | 1929 - Canadian National Railways place in service the first road diesel
electric passenger locomotive. This consisted of two units, weighing a total
of 335 tons.
|
 | 1929, September 28 - The Hudson Bay Railway reaches its northern terminus
at Churchill, Manitoba. This was originally operated by Canadian National on
behalf of the Government. It became part of the CN system on September 5, 1951.
|

 | 1930, September 29 - The final section of the 3'6" gauge railway on Prince
Edward Island is converted to standard gauge. The conversion work on the
island had started in 1919.
|
 | 1932, July 15 - The Temiskaming and Northern Ontario Railway is opened
throughout between North Bay and Moosonee, Ont. Construction was started on May
10, 1902. The name was subsequently changed to Ontario Northland Transportation.
|
 | 1933, April - Canadian National and Canadian Pacific pool certain passenger
services as a result of the Canadian National Canadian Pacific Act, 1933.
|
 | 1936, September 18 - On test a new lightweight streamlined passenger train
attains an officially recorded speed of 112 1/2 mph on the Canadian
Pacific Winchester Subdivision near St. Telesphore, Quebec, with 4-4-4
locomotive no. 3003.
|
 | 1937, December - Canadian Pacific takes delivery of its first diesel electric
locomotive, a switching unit numbered 7000.
|
 | 1939, May 17 - Royal Tour of Canada commences with the arrival of King
George VI and Queen Elizabeth at Wolfe's Cove, Quebec on the Empress of
Canada. The 12 car train, (five from CP, five from CN and the two
vice-regal cars), in royal blue and aluminum, left Quebec City on May 18.
A pilot train, carrying officials and the press, preceeded the royal train by
one hour and no other trains were permitted to travel within this period.
The travel arrangements were shared by the two railways with CP being
responsible for the westward journey to Victoria. CP used 4-6-4
locomotives 2850 and 2851 for the royal and pilot trains respectively, except
for the Ottawa to Brighton, Ont, section, which was over CN track. 2850
hauled the royal train without change right through to Vancouver, a total
distance of 3224 miles. Royal crowns were affixed to the running boards of
both locomotives and these were eventually fitted to the entire class
(2820-2864) which, following approval from their majesties, came to be known as
Royal Hudsons.
|
Full details are shown in Branchline, June 1999.

 | 1943, July 14 - Central Station, Montreal is opened by Canadian National.
|
 | 1949, April 1 - Newfoundland becomes the tenth province of Canada and the
Newfoundland Railway becomes part of the Canadian National system. This
narrow gauge system had been operated by the island government since 1923.
|
 | 1949 - Canadian Pacific accepts its last new steam locomotive (in March)
class T-l-c 2-10-4 no. 5935 from Montreal Locomotive Works, and acquires its
first road diesel-electric locomotives nos. 8400-8404 (in September) for
conversion of motive power on the Montreal-Newport-Wells River line.
|

 | 1950, February 10 - The Temiscouata Railway is entrusted to Canadian
National. This line, which was opened throughout on October 1, 1891, ran from
Rivière du Loup to Edmundston and from Edmundston to Connors.
|
 | 1950, August 22 - The railway system is paralyzed by a nationwide railway
strike. Services were resumed on August 31.
|
 | 1951, February 9 - The Royal Commission on Transportation, the Turgeon
Commission produces its report.
|
 | 1951, August 26 - Canadian railways adopt the Uniform Code of Operating
Rules for train operation purposes.
|
 | 1952, October - The Pacific Great Eastern Railway opens between North
Vancouver and Prince George.
|
 | 1953 - Budd-built rail diesel cars (RDC) introduced on several Canadian
runs. These are called "Railiners" by CN and "Dayliners" by CP.
|
 | 1954, February 13 - The Quebec North Shore and Labrador Railway is opened
between Sept Isles, Que. and Schefferville, Labrador, construction having
commenced in 1950.
|
 | 1954, March 30 - Toronto Transit Commission opens the first part of the Toronto
subway, the first subway in Canada.
|
 | 1955, April 25 - Canadian Pacific inaugurates its new stainless steel,
scenic-domed transcontinental passenger train "The Canadian" between
Montreal/Toronto and Vancouver.
|
 | 1955, May 14 - A causeway is completed across the Strait of Canso between
Cape Porcupine and Balache Point, Nova Scotia. This involved a 14 mile main line
diversion for the rerouting of railway traffic linking directly Cape Breton
Island with the mainland. Previous movements were by car ferry across the Strait
of Canso.
|
 | 1957, May 17 - Canadian National opens a 40 mile diversion of its Montréal to
Toronto main line required in the construction of the St. Lawrence Seaway.
|

 | 1960, April 25 - Locomotive number 6043 makes the last scheduled run of a
steam locomotive on Canadian National on train 76 between The Pas and
Winnipeg.
|
 | 1960, November 6 - The last steam locomotive to operate officially on
Canadian Pacific pulls a special train to St. Lin from Montreal. Locomotive
is class A-l-e no. 29, 4-4-0 built in 1887.
|
 | 1961, March - The Royal Commission on Transportation, the MacPherson
Commission, publishes its report. These recommendations lead to the National
Transportation Act of 1967.
|
 | 1964, November - The Great Slave Lake Railway, operated by Canadian
National is opened for traffic from Pine Point, Northwest Territories, to Roma
Junction, Alberta. The open for carriage order is not issued by the Canadian
Transport Commission until 7 July, 1967.
|
 | 1965, October 30 - The Canadian National-Canadian Pacific passenger pool
train arrangement is terminated.
|
 | 1965, October 31 - Canadian National introduces "Rapido" passenger
service between Montreal and Toronto. This was extended to Quebec in the
following year.
|
 | 1966, October 14 - first day of operation of the Montreal subway operated
by la Société de Transport de la Communauté Urbaine de Montréal (STCUM).
|
 | 1967, May 23 - "GO Transit" is inaugurated by the Province of Ontario
between Pickering, Toronto, Oakville and Hamilton under an operating agreement
with Canadian National.
|
 | 1967, July 11 - The first major "unit train" movement in Canada is
inaugurated by Canadian Pacific - 3,700 tons of sulphuric acid from the Copper
Cliff plant of CIL nr. Sudbury to Sarnia, Ontario.
|
 | 1967, November 16 - Canadian Pacific begins testing Canada's first
remote-controlled mid-train diesel locomotives in regular freight
service, using new "Robot" radio-command system.
|
 | 1968 - Canadian National introduces the "Tempo" service between
Toronto-Windsor-Sarnia using new light-weight cars.
|
 | 1968, December - Turbo train is placed in limited service between
Montreal and Toronto, but because of technical problems the service is suspended
on January 7, 1969.
|
 | 1969, July 2 - Canadian National abandons Newfoundland passenger trains
101-102.
|

 | 1970, April 21 - Canadian Pacific unveils Canada's first double-deck
passenger train comprising nine air-conditioned cars built by Canadian
Vickers Limited at a cost of $2.8 million. The cars went into operation April 27
on the Montreal Lakeshore suburban service.
|
 | 1970, April 30 - The first CP coal unit train, comprising 88 cars and
carrying more than 9,000 tons of coking coal destined to Japan, arrives at
Roberts Bank superport after a 700-mile run from Sparwood, B.C.
|
 | 1971, September 10 - Pacific Great Eastern Railway extension from Fort
St. John to Fort Nelson, B.C. is opened for traffic.
|
 | 1972, April 1 - Pacific Great Eastern Railway changes its name to British
Columbia Railway.
|
 | 1972, October 16 - The Commission of Inquiry in the Matter of the Employment
Practices Relating to the Running-Trades' Employees in the Railway Industry, the
Gallagher Commission publishes its report. This looked at the employment
practices, particularly hours of work.
|
 | 1974, March 17 - A CP Rail freight train hits a rock slide and derails at
Spences Bridge, BC killing two crew members. This lead to the eventual
installation of ditch lights on Canadian trains.
|
 | 1976, October - The Commission on the Costs of Transporting Grain by Rail, the
Snavely Commission produces its report.
|
 | 1977, January 12 - Via Rail Canada is incorporated to operate inter-city
passenger rail service.
|
 | 1977, April 18 - The Hall Commission Report on Grain Handling and
Transportation is published. This recommends limited branch line abandonment on
the prairies.
|
 | 1978, March 13 - GO introduces its first bi-level coaches.
|
 | 1979, November 10 - CP Rail no. 54 suffers a hot axle box and derails 24 cars
containing dangerous commodities, in Mississauga, Ont. Almost a quarter
of a million people were evacuated for periods of up to five days. The Grange
Commission report on the accident is published in December, 1980.
|

 | 1981, November 14 - VIA cuts nearly 20% of its services.
|
 | 1983 - BC Rail begins operating the Tumbler Ridge line, Canada's first
railway electrified at 50kv AC.
|
 | 1986, January 3 - The Skytrain commences operation between Vancouver and
New Westminster, BC.
|
 | 1986, February 8 - A head on collision between a freight train and a passenger
train near Hinton, Alberta claims 23 lives.
|
 | 1986 - The Central Western Railway commences operation by acquiring the
CN Stettler subdivision in Alberta.
|
 | 1986, December - The Report of the Commission of Inquiry into the Hinton Train
Collision, the Foisy Report is published.
|
 | 1988, October - The last part of the railway on Newfoundland, operated by
CN Rail, is abandoned.
|
 | 1989, November 14 - CP Rail commences cabooseless train operations. CN
Rail follows on February 1, 1990.
|
 | 1989, December 12 - First revenue train runs through the CP Rail 9.1 mile
Mount MacDonald Tunnel. This is the longest rail tunnel in the Americas.
|
 | 1989, December 31 - The last part of the railway on Prince Edward Island,
operated by CN Rail, is abandoned.
|

 | 1990, January 15 - VIA cuts half of its passenger network. Included in
these cuts are a decision to run just one transcontinental train between Toronto
and Vancouver via CN through Winnipeg, Saskatoon, Edmonton and Jasper.
|
 | 1990, January 16 - Canadian Rail Operating Rules are approved by the
Minister of Transport
|
 | 1992 - The Central Western Railway expands its operation by acquiring the
CP Coronation and Lacombe subdivisions in Alberta.
|
 | 1992, April 6 - The Goderich Exeter Railway commences operations over the
former CN line between Stratford Junction and Goderich and from Clinton Junction
to Centralia in Ontario.
|
 | 1993, January - The report of the National Transportation Act Review Commission,
the Rivard Commission is published.
|
 | 1993, October 1 - The Cape Breton and Central Nova Scotia Railway
commences operation over the former CN line between Sydney and Truro, Nova
Scotia.
|
 | 1994, August 29 - The Windsor and Hantsport Railway commences operation
in Nova Scotia.
|
 | 1994, December 1 - the Société des chemins de fer du Québec commences
operation over the former CN line from Limoilou to Clermont, Québec.
|
 | 1995, January 7 - The New Brunswick Southern Railway commences operation
over former CP trackage from McAdam to Saint John, N.B. with a branch from
McAdam to St. Stephen.
|
 | 1995, May 5 - Official CN opening ceremony for a new tunnel between
Sarnia, Ont and Port Huron, MI. The tunnel can handle full height double stack
container cars.
|
 | 1995, October 26 - The CN commuter line between Montréal Central station and
Deux Montagnes is reopened with modernized equipment. The new electric
multiple unit trains, operating at 25 kv AC, replace aging equipment, some of it
going back to the opening of the line in 1918.
|
 | 1995, November 1 - Commuter service commences over CP Rail between Vancouver
and Mission, BC.
|
 | 1995, November 19 - Canadian National shares begin to trade on the
Toronto Stock Exchange.
|
 | 1996, September 12 - Rocky Mountain Railtours runs the longest passenger
train in Canadian history. Three GP40 locomotives hauled 34 cars from Vancouver
to Kamloops.
|
 | 1996, September 14 - York - Durham Heritage Railway commences operation
over the former CN line between Uxbridge and Stouffville, Ont.
|
 | 1996, September 28 - Iron Road Railways, under the name Quebec
Southern Railway commences operation over the following former CP lines in
Quebec:
|
Lennoxville - St-Jean Brookport - Wells River (VT) Farnham - Ste-Rosalie Jct Farnham - Stanbridge
 | 1996, October 1 - The St. Lawrence and Hudson Railway is formed by
merging the CP Rail routes in southern Ontario and Quebec with its Delaware and
Hudson subsidiary in northern USA. The STLH name was first used about June 1
although the legal entity was not established until October 1.
|
 | 1996, October 30 - RaiLink-Ottawa Valley takes over operation of
the former CP line between Smiths Falls and Cartier, Ont as well as the Mattawa
to Temiskaming branch in Quebec.
|
 | 1996, November 2 - Ontario L'Orignal Railway (RailTex) commences
operation over the former CN line between Glen Robertson, Hawkesbury and
L'Orignal, Ont.
|
 | 1996, December 1 - Chemin de fer Baie des Chaleurs, a wholly owned
subsidiary of the Quebec Railway Corporation, commences operation over
the former CN line beween Matapedia and Chandler, Que.
|
 | 1997, June 16 - Corporation du chemin de fer de la Gaspésie takes over
the former CN line between Chandler and Gaspé, Que. This is a non profit
corporation owned by local municipalities. Operation of the line is
sub-contracted to the Chemin de fer Baie des Chaleurs which commenced
operation between Matapedia and Chandler, Que in December 1996.
|
 | 1997, June 24 - Port Colborne Harbour Railway, a division of the
Caledonia and Hamilton Southern Railway (Trillium Rail), starts operation
between Welland and Port Colbourne on the following lines in Ontario:
|
CN Port Colbourne Spur (6.6 miles). Macy Spur (west of the Welland Canal). Government Spur (off Macy Spur). a new 1.1 mile connection between the Port Colbourne Spur and the Macy
Spur.
 | 1997, July 12 - Waterloo - St. Jacobs Railway commences passenger service
over the former CN Waterloo Spur between Waterloo and Elmira, Ont.
|
 | 1997, August 20 - Hudson Bay Railway, owned by Omnitrax of Denver,
Colorado, takes over the operation of the former CN lines between The Pas, Flin
Flon, Lyn Lake and Churchill, Man.
|
 | 1997, September 4 - RaiLink-Lakeland & Waterways takes over the
former CN lines in northeastern Alberta from Boyle to Lynton, near Fort
McMurray. Agreement was reached on 2 September, operation commenced on 4
September and formal transfer took place on November 24.
|
 | 1997, September 4 - Huron Central Railway, owned by Genessee Rail-One,
takes over operation of the former CP line between Sault Ste. Marie and Sudbury,
Ont.
|
 | 1997, September 20 - RaiLink Southern Ontario takes over the operation of
the former CN Hagersville subdivision between Nanticoke and Brantford including
the Burford Spur. On December 15 the company took over the former CN
Northern and Northwestern Spur.
|
 | 1997, November 11 - Quebec Gatineau Railway takes over operation of the
former CP Trois Rivieres and Lachute subdivisions between Quebec City and Hull.
|
 | 1997, December 8 - the Carlton Trail Railway (Omnitrax) takes over the
operation of the following CN lines in north western Saskatchewan:
|
 |
Warman Junction to just north of Prince Albert.
Speers Junction to Meadow Lake.
|
 | 1998, January 1 - the Ontario Southland Railway takes over the operation
of the Guelph Junction Railway (formerly the Goderich subdivision) which
had been leased by CP from the City of Guelph since 1888. The Ontario
Southland also took over the 3.1 mile remnant of the CP owned Guelph and
Goderich Railway.
|
 | 1998, January 19 - the CN line bewteen Moncton, NB and Mont-Joli, Que is
transferred to the Quebec Railway Corporation, through its wholly owned
subsidiaries as follows:
|
 |
New Brunswick East Coast Railway between Pacific Junction, near Moncton,
and Campbellton, NB.
Matapedia Railway between Campbellton, NB and Mont-Joli, QC.
|
 | 1998, May 3 - RaiLink-MacKenzie Northern takes over the operation of the
CN line from Smith, AB to Hay River, NWT.
|
 | 1998, October 1 - Southern Rails Cooperative takes over operation of CN
Avonlea subdivision from Avonlea to Moose Jaw, SK.
|
 | 1998, November 2 - Quebec Gatineau Railway commences operation over the
CN Montfort Spur between Mirabel and Saint-Jerome, QC. Access to
the CN network is continued through an interchange agreement between CN, OGRY
and St.L&H.
|
 | 1998, November 9 - St. Thomas and Eastern Railway, a division of Trillium
Rail, commences operation over the fomer CN Cayuga Spur between St. Thomas and
Delhi, ON.
|
 | 1998, November 16 - Goderich and Exeter Railway takes over operation of
the CN Guelph subdivision between London and Silver, ON.
|
 |
1998, November 20 - Okanagan Valley Railway commences operation over the
former CP line between Sicamous and Kelowna, BC (including running rights over
the CN between Vernon and Kelowna). The formal handing over ceremony took
place on January 15, 1999.
|
 |
1998, December 1 - St. Lawrence and Atlantic Railroad (Quebec) commences
operation over the CN Sherbrooke subdivision between St. Rosalie, QC and Norton,
VT.
|
 | 1998, December 13 - Ottawa Central Railway, a subsidiary of RailLink's
Quebec Railway Corporation, commences operation over the CN Beachburg
subdivision between Ottawa and Pembroke, ON as well as the Walkley line in
Ottawa. The Ottawa Central also received running rights over the
Alexandria subdivision between Ottawa and Coteau.
|
 | 1999, January 8 - RailAmerica Inc. takes over the operation of the Esquimalt
and Nanaimo Railway from CP. The new company, known as E&N Railway
Company (1998) Ltd, purchased the line between Port Alberni and Nanaimo and
leased the section from Victoria to Nanaimo.
|
 | 1999, Feburary 14 - Quebec Railway Corporation takes over the former CN Mont
Joli and Matane subdivisions linking Matane to Riviere du Loup, QC.
The Matane sub. was the former Canada and Gulf Terminal Railway.
|
 | 1999, February 26 - Ontario Southland commenced operation over the CP Port
Burwell subdivision from Ingersoll to Tillsonburg, ON.
|
 | 1999, March 22 - RaiLink Ltd.takes over operation of the CN Coronado,
Bonnyville, and Lac La Biche subdivisions, northeast of Edmonton. The
line extends from St. Paul Junction, immediately north of Edmonton, to Boyle and
northeast to Grande Centre and Elk Point. It also connects with RaiLink's
existing Lakeland and Waterways line at Boyle.
|
 | 1999, May 2 - Central Manitoba Railway takes over the operation of the
former CN Pine Falls subdivisions.
|
 | 1999, June 6 - Central Manitoba Railway, a subsidiary of Cando
Contracting, takes over the operation of the former CN Carman sub. from
m. 0.13 to m. 50.50.
|
 | 1999, June 27 - Alberta RailNet takes over the former CN Grande
Cache (from Swan Landing to Grande Prairie, m. 1.80 to m. 232.90), Grande
Prairie (from Rycroft to Hythe, m. 0 to m. 89.19) and Smoky (Tangent
to Spirit River, m. 306.2 to m. 357.80) subdivisions in Alberta.
|
 | 1999, June 30 - Southern Rails Cooperative (Red Coat Road and Rail) takes
over operation of the 71.5 mile CP line from Pangman to Assiniboia in
Saskatchewan.
|
 | 1999, August - Manitoba Southern Railway takes over operation of the CN
line from Morris to Elgin (Miami and Hartney subdivisions).
|
 | 1999, September 18 - Trillium Rail takes over operation of 41 miles of
industrial trackage in Ontario's Niagara Peninsula comprising sections of the
Cayuga sub. and the Thorold, Canal, Grantham, Fonthill, Town Line and West
Welland spurs. The lines will be operated by a Trillium subsidiary, the
Port Colborne Terminal Railway.
|
 | 2000, January 6 - Quebec Central Railway takes over the former CPR Quebec
Central Lines. Service between Sherbrooke and Vallee Jonction resumed 24 June
2000. The new Quebec Central is operated by Express Marco Inc.
|
 | 2000, Jume 19 - The last rail on the order books of Sysco (Sydney Steel)
is rolled.
|
 | 2000, September 29 - the Town of Orangeville, ON purchases the former CPR
Owen Sound subdivision between mile 2.4 and mile 36.7. The line is
managed by Orangeville & Brampton Rail Association Group and Cando
Contracting operates the line with running rights to an imterchange with CPR at
Streetsville.
|

|
|